With a view to the scheduled implementation of the work of the Service Team East, it carried out the repair work of the electrical network on schedule, and as a result, on December 4, the investor’s acceptance of the project task titled “Renovation of the electrical network at BP 13 in Zawadowka.”
Within the scope of the task, it was necessary to develop a technical design and carry out work to replace the RG-24/C cast-iron switchgear, the RG-30/C indoor cast-iron switchgear, and install a new ZK facility switchgear with a GWP circuit breaker.
The scope of work also included replacing the YAKXS 4×70 cable on the RG-24/C section to the ZK, and the installation of the cable section from the ZK connector to the RG-30/C switchgear, including the laying of the YKXS 4×25 cable along the hall’s support structure.
The YKXS 4X25 cable from RG-24/C to RG-RB/C was also replaced.
The work in question was carried out taking into account commercial and operational activities without disrupting the normal operation of the fuel base.
The completed overhaul will significantly contribute to improving the operation and maintenance of the power grid and maintaining the security of power supply continuity for the sensitive facilities of the base.
We thank our clients very much for trusting us with tasks that require our knowledge and experience, as well as our knowledge of the facility’s infrastructure.